Completion test of cogeneration and electricity symbiosis to join the power system
The purpose of the completion test of the cogeneration and electricity symbiosis power system is to confirm that the newly added cogeneration and electricity symbiosis system meets the standards of safe and reliable power facilities, and to avoid unsafe power transmission caused by electricity accidents or delays in power transmission time. This includes verifying the design, equipment and operation of the cogeneration symbiosis system to ensure that it complies with relevant regulations and standards, and can operate in safe coordination with the existing power system.
Specific content includes:
- System testing:Verify the functions and performance of the cogeneration system, such as power generation, voltage, current, efficiency, etc., to ensure that it meets the design requirements
- Power distribution system integration test:Verify the integration of the cogeneration symbiosis system with the existing power distribution system, including wiring, protection devices, control systems, etc., to ensure its coordinated operation
- Safety test:Verify the safety measures of the cogeneration symbiosis system, such as insulation testing, short circuit testing, overload testing, etc., to ensure its safety and reliability.
- Verification standards and regulations:Verify that the design, installation and operation of the cogeneration symbiosis system comply with relevant standards and regulations, such as electricity laws, power equipment installation and inspection management rules, etc.
The purpose of the completion testIt is to ensure the quality and safety of the cogeneration system, and to provide a basis for subsequent operation and maintenance.