Completion test of adding electrical equipment to the power system
The completion test of electrical equipment joining the power system aims to ensure the safe integration of new equipment with existing systems and comply with relevant regulations and design standards. This can not only ensure the safety of electricity consumption, but also avoid delays in power transmission time due to design discrepancies.
Specifically, this trial includes:
- Design review:Ensure that equipment design complies with relevant regulations and standards
- On-site inspection:Confirm whether the equipment installation complies with the design drawings and related specifications
- Functional test:Verify that the function and performance of the device meet the requirements
- Safety test:Test the insulation properties and short circuit protection of the equipment to ensure the safety and reliability of the equipment
- Performance test:Performance indicators such as efficiency and power factor of test equipment
- Completion report:Record the test results and confirm whether they comply with relevant specifications
purpose:
- Safe and reliable:Ensure that the equipment added to the system is safe and reliable, and avoid electricity accidents caused by equipment problems
- Comply with specifications:Ensure that the equipment complies with relevant regulations and design standards
- Timely power delivery:Ensure that the equipment can be added to the system in time to send power, to avoid delays due to equipment problems
Relevant inspection agencies:
- Relevant competent authorities of the central government or their recognized inspection agencies
- Electrical equipment inspection and maintenance industry
Completion test report:
- When the on-site installation does not match the design, it should be filled in one by one in the completion report form, and the District Sales Office shall review and deal with it.
- The completion test report should contain the results of design review, on-site inspection, functional testing, safety testing, performance testing, etc.
In short, The completion test of adding electrical equipment to the power system is an important part of ensuring the safety and reliability of electricity consumption. It ensures that the equipment can be added to the system in a timely and safe manner to transmit power, and to avoid delays or accidents due to equipment problems.